2012年第3期
当前位置: 首页 > 过刊浏览 > 2012年第3期 >

反季节全冠大树移植技术

张跃生,高静,吴彩琼
广东省深圳市龙岗区园林绿化管理所,深圳市铁汉生态环境股份有限公司,广东省深圳市铁汉生态环境股份有限公司
摘要:
文章以广东省深圳市龙岗地铁三号线大运站周边绿化工程项目移栽胸径≥15 cm带全冠大树的工作经验,分析总结了反季节高温条件下(5、6月)大树移栽的技术措施。
关键词:   反季节〓全冠〓大树移栽〓绿化施工
DOI:
分类号
基金项目:深圳市科技计划项目“园林大乔木免剪移植关键技术研究”(JSA200903190824A)。
 
The Technical Measures of Big Trees Transplanting with =Full Crown in Couterseason
zhang yuesheng,Gao Jing and wu caiqiong
Longgang District Landscape Management of Shenzhen, Shenzhen Guangdong,,Shenzhen Techand Ecology
Abstract:
In the high temperature conditions(May and June), greening project around Longgang Subway Line 3 Universiade station are completed through transplanting diameter ≥ 15 cm trees with full crown. This article analyzes and summarizes the technical measures in the process of transplanting.
Key words:   couterseason, full crown, transplanting big trees, greening construction